top of page
Ericksen Community Center

Ericksen Community Center - Youth Room

This job involved 2 rounds of grinding. The first to remove the old carpet glue and the second to grind the concrete in preparation of adding the epoxy base coat. STONEHENGE FLAKE was applied and a Polyaspartic topcoat added to protect the floor.

Ray's Pub

Ray's Pub

Old tile was replaced with a DOMINO FLAKE floor in the kitchen and back bar area. Grip was added for a non-skid finish.  A Polyaspartic topcoat finished this job off for years of protection.

Fastenal

Fastenal

A tinted floor replaces what used to be a rundown tile floor. 

bottom of page